Posted 2 years ago

Surveyor

ID : 2242

Sorry, this position is no longer open for applications.

Back to all jobs
  • Vessel EOHF CTV
  • Scope Topograph - GBS measures
  • Material total station with prism
  • Number of reps x2 (1 rep /day shift for 14 days) - 12h offshore (incl CTV return trip) / onshore 8h - 7 days /week
  • Rotation 14 days.
  • Duration ~3 to 5 months
  • Planning Onshore/offshore mob at earliest: from 1st Sept 2022 (onshore prep phase) /7th Sept 2022 (offshore) for 1st rep - 2nd rep 14 days later (15th onshore / 22nd offshore - exact date TBC).
  • Training GWO mandatory
  • Accommodation Fecamp, day trip to climb on GBS

Levelling at TOC can be provide by indirect levelling with precise total station (at least 1 second precision) and prism mounted on a mini-stick. For each GBS, surveyor shall repeat complete set of measurements at least 3 times on the geodetic points. These 3 measures shall be consistent below millimeter accuracy. Check shall be realized on site before leaving GBS. If millimeter accuracy is not achieved, extra measurement shall be carried out till respect this targeted accuracy.

Longitudinal and transverse compensator index errors shall be perform before each GBS measurements and Total station must have a calibration certificate less than one year old.

Topographical Surveyor will access to GBS form EOHF or contractor CTV.

Actual work organization is 12h days working with return to Fecamp (or nearby) harbor by night and onshore accommodation (to be organized by contractor).

Other EHOF or foundation contractor personal (climbing buddy) will access to GBS at same time for safety reason.

Considering number of foundation to be measured (71, i.e.; 30 to 40 days at sea), rotation of personal shall be scheduled.

Surveyor for TOC levelling shall have valid habilitation stated in §4.2 including “boat landing transfer » and « climbing and rescue training » modules .

TOC levelling Reporting :

Result will be plotted on a measurement report with the 3 measurements, the average of these measurement and the deviations from the contractor’s historical data (design data, precast surveys and inclinometry records).

Results shall be transmitted within 2 open day after measurement.

A report shall be done by GBS or by group of GBS (with maximum weekly update).

Report shall include comparison with foundation contractor measurement and investigation of difference.

  • Vessel EOHF CTV
  • Scope: Topograph - GBS measures
  • Material total station with prism
  • Number of reps x2 (1 rep /day shift for 14 days) - 12h offshore (incl CTV return trip) / onshore 8h - 7 days /week
  • Rotation 14 days.
  • Duration~3 to 5 months
  • Planning Onshore/offshore mob at earliest: from 1st Sept 2022 (onshore prep phase) /7th Sept 2022 (offshore) for 1st rep - 2nd rep 14 days later (15th onshore / 22nd offshore - exact date TBC).
  • Training GWO mandatory
  • Accommodation Fecamp, day trip to climb on GBS
Back to all jobs

You may also like these jobs

Engineering & Design
Posted 10 days ago

LNG Planning & Reporting Engineer

France
Oil & Gas Upstream
ID : 3746
We are looking for LNG Planning & Reporting Engineer to join our consultant team for an oil and gas project in France.
Engineering & Design
Posted 17 days ago

P3 Projector Designer

France
Oil & Gas Downstream
ID : 3741
We are looking for a P3 Projector Designer to join our consultant team for an oil and gas project in France.
Eva BERTON
Eva BERTON
Head of Recruitment

In recent years, we have invested in the digitalization of our recruitment process so that our recruiters can dedicate more time to qualitative discussions with the selected candidates. We have also redesigned our job board on the website to make it easier to find jobs and apply. The entire Recruitment team is committed to providing the best possible experience to our candidates.