Publié il y a 2 années

Surveyor

Réf : 2242

Désolé, ce poste n'est plus ouvert aux candidatures.

Retour aux offres
  • Vessel EOHF CTV
  • Scope Topograph - GBS measures
  • Material total station with prism
  • Number of reps x2 (1 rep /day shift for 14 days) - 12h offshore (incl CTV return trip) / onshore 8h - 7 days /week
  • Rotation 14 days.
  • Duration ~3 to 5 months
  • Planning Onshore/offshore mob at earliest: from 1st Sept 2022 (onshore prep phase) /7th Sept 2022 (offshore) for 1st rep - 2nd rep 14 days later (15th onshore / 22nd offshore - exact date TBC).
  • Training GWO mandatory
  • Accommodation Fecamp, day trip to climb on GBS

Levelling at TOC can be provide by indirect levelling with precise total station (at least 1 second precision) and prism mounted on a mini-stick. For each GBS, surveyor shall repeat complete set of measurements at least 3 times on the geodetic points. These 3 measures shall be consistent below millimeter accuracy. Check shall be realized on site before leaving GBS. If millimeter accuracy is not achieved, extra measurement shall be carried out till respect this targeted accuracy.

Longitudinal and transverse compensator index errors shall be perform before each GBS measurements and Total station must have a calibration certificate less than one year old.

Topographical Surveyor will access to GBS form EOHF or contractor CTV.

Actual work organization is 12h days working with return to Fecamp (or nearby) harbor by night and onshore accommodation (to be organized by contractor).

Other EHOF or foundation contractor personal (climbing buddy) will access to GBS at same time for safety reason.

Considering number of foundation to be measured (71, i.e.; 30 to 40 days at sea), rotation of personal shall be scheduled.

Surveyor for TOC levelling shall have valid habilitation stated in §4.2 including “boat landing transfer » and « climbing and rescue training » modules .

TOC levelling Reporting :

Result will be plotted on a measurement report with the 3 measurements, the average of these measurement and the deviations from the contractor’s historical data (design data, precast surveys and inclinometry records).

Results shall be transmitted within 2 open day after measurement.

A report shall be done by GBS or by group of GBS (with maximum weekly update).

Report shall include comparison with foundation contractor measurement and investigation of difference.

  • Vessel EOHF CTV
  • Scope: Topograph - GBS measures
  • Material total station with prism
  • Number of reps x2 (1 rep /day shift for 14 days) - 12h offshore (incl CTV return trip) / onshore 8h - 7 days /week
  • Rotation 14 days.
  • Duration~3 to 5 months
  • Planning Onshore/offshore mob at earliest: from 1st Sept 2022 (onshore prep phase) /7th Sept 2022 (offshore) for 1st rep - 2nd rep 14 days later (15th onshore / 22nd offshore - exact date TBC).
  • Training GWO mandatory
  • Accommodation Fecamp, day trip to climb on GBS
Retour aux offres

Ces offres peuvent vous intéresser

Management & Support
Publié il y a 6 jours

Planning & Performance: Head of Planning & Economics

Espagne
Pétrole & Gaz
Réf : 3845
We are looking for a Planning & Performance: Head of Planning & Economics to join our consultant team for an oil and gas project in spain .
Finance & Comptabilité
Publié il y a 7 jours

Offshore Wind Cost Controller

France
Eolien
Réf : 3844
We are looking for an Offshore Wind Cost Controller to join our consultant team for a wind project in France.
Eva BERTON
Eva BERTON
Responsable Recrutement

Ces dernières années, nous avons investi dans la digitalisation de notre processus de recrutement afin que nos recruteurs puissent dédier plus de temps aux échanges qualitatifs avec les candidats sélectionnés. Nous avons également repensé notre page Offres de mission sur le site web pour faciliter la recherche de missions et les candidatures. Toute l'équipe Recrutement a à cœur d’offrir la meilleure expérience possible à nos candidats.