Publicado há mais de 6 mêss atrás

Surveyor

Referencia : 2242
  • Vessel : EOHF CTV
  • Scope:  Topograph – GBS measures
  • Material : total station with prism
  • Number of reps: x2 (1 rep /day shift for 14 days) – 12h offshore (incl CTV return trip) / onshore 8h – 7 days /week
  • Rotation: 14 days.
  • Duration: ~3 to 5 months
  • Planning: Onshore/offshore mob at earliest: from 1st Sept 2022 (onshore prep phase) /7th Sept 2022 (offshore) for 1st rep – 2nd rep 14 days later (15th onshore / 22nd offshore – exact date TBC).
  • Training : GWO mandatory
  • Accommodation : Fecamp, day trip to climb on GBS

Levelling at TOC can be provide by indirect levelling with precise total station (at least 1 second precision) and prism mounted on a mini-stick. For each GBS, surveyor shall repeat complete set of measurements at least 3 times on the geodetic points. These 3 measures shall be consistent below millimeter accuracy. Check shall be realized on site before leaving GBS. If millimeter accuracy is not achieved, extra measurement shall be carried out till respect this targeted accuracy.

Longitudinal and transverse compensator index errors shall be perform before each GBS measurements and Total station must have a calibration certificate less than one year old.

Topographical Surveyor will access to GBS form EOHF or contractor CTV.

Actual work organization is 12h days working with return to Fecamp (or nearby) harbor by night and onshore accommodation (to be organized by contractor).

Other EHOF or foundation contractor personal (climbing buddy) will access to GBS at same time for safety reason.

Considering number of foundation to be measured (71, i.e.; 30 to 40 days at sea), rotation of personal shall be scheduled.

Surveyor for TOC levelling shall have valid habilitation stated in §4.2 including “boat landing transfer » and « climbing and rescue training » modules .

TOC levelling Reporting :

Result will be plotted on a measurement report with the 3 measurements, the average of these measurement and the deviations from the contractor’s historical data (design data, precast surveys and inclinometry records).

Results shall be transmitted within 2 open day after measurement.

A report shall be done by GBS or by group of GBS (with maximum weekly update).

Report shall include comparison with foundation contractor measurement and investigation of difference.

  • Vessel : EOHF CTV
  • Scope:  Topograph – GBS measures
  • Material : total station with prism
  • Number of reps: x2 (1 rep /day shift for 14 days) – 12h offshore (incl CTV return trip) / onshore 8h – 7 days /week
  • Rotation: 14 days.
  • Duration: ~3 to 5 months
  • Planning: Onshore/offshore mob at earliest: from 1st Sept 2022 (onshore prep phase) /7th Sept 2022 (offshore) for 1st rep – 2nd rep 14 days later (15th onshore / 22nd offshore – exact date TBC).
  • Training : GWO mandatory
  • Accommodation : Fecamp, day trip to climb on GBS
Voltar para todas as ofertas

Aplique agora

Estas vagas podem interessá-lo

Operações & Produção
Publicado há mais de 17 dias atrás

Well Integrity Desk Engineer

Argélia
Pétroleo & Gaz
Referencia : 2732

We are looking for a Well Integrity Desk Engineer.

Operações & Produção
Publicado há mais de 24 dias atrás

Driller

Tunísia
Pétroleo & Gaz
Referencia : 2697

We are looking for Driller with resident work pattern in Tunisia.