DURATION / LOCATION
Starting date: Q1 2025
Duration: 12 months
Renewable: Yes
Location: KSA, Jubail
Status: Residential
CONTEXT & ENVIRONMENT
TotalEnergies and Saudi Aramco are developing a new petrochemicals expansion project in the Kingdom of Saudi Arabia integrated with their existing joint venture SATORP (62.5% Saudi Aramco / 37.5% TotalEnergies) that is a world-class refinery operated since 2014. It is flagship megaproject for the two Companies, referred to as AMIRAL project, and is an important deployment step in the group strategy to develop fully integrated production sites.
The AMIRAL project is run through the SATORP JV located in the east coast of the KSA, and as such all the project personnel are seconded to SATORP. The AMIRAL project is a highly complex petrochemicals program including multi EPCC packages, connected to the SATORP refinery and interfacing with several downstream new investors and several third-party stakeholders located in the industrial area Jubail 1&2 and King Fahd Industrial Port. The project includes a mixed-feed steam cracker that will produce 3.5 MT/y of chemicals, related high added value petrochemicals and HDPE units, with all supporting utilities, storages, off-sites, and buildings.
The execution of the packages (EPCC Lump Sum Contracts) will be supervised by the shareholders through a project management team (PMT) staffed by secondees from TotalEnergies, Saudi Aramco, and external supplemental employees into several entities dedicated to the program, to handle financing aspects, business development, logistics, interface with authorities, operations, and execution, and follow EPCC package Contractor activities. The PMT team is expected to peak at 350 persons and will be based in Europe, Korea and in the Kingdom of Saudi Arabia during 12-24 months for the detailed engineering phase, before being fully relocated in Jubail industrial area adjoining the construction site, for the completion of the detailed engineering, construction, commissioning, and start-up activities.
The project scope is divided into a PMT general Entity and 8 EPCC packages with PMT representatives.
MISSIONS / SERVICE DIMENSIONS
The service holder will ensure that all pre-commissioning and commissioning activities in his Package are prepared and executed according to OPERCOM® methodology and ICAPS© Mobiweb in a safe and efficient manner, adhering to the planned schedule. This role involves close coordination with the EPCC package commissioning manager.
Key Responsibilities
Additional Responsibilities
ACTIVITIES
The service provider will implement adequate supervision and control for the works, in order that all commissioning activities are executed in accordance with the overall Package schedule.
TECHNICAL REQUIREMENTS
OTHER OBSERVATIONS
The service provider will have to supervise EPCC contractors construction activities, in order that the field activities are completed (AOC reached) as per the Project schedule.
In recent years, we have invested in the digitalization of our recruitment process so that our recruiters can dedicate more time to qualitative discussions with the selected candidates. We have also redesigned our job board on the website to make it easier to find jobs and apply. The entire Recruitment team is committed to providing the best possible experience to our candidates.