Starting date ASAP 2024
Duration12 Months
Location FRANCE / Paris or UK / London (depending on candidate's preference) during FEED (FEED contractor will be based in UK - LONDON) and then at EPC premises in Azerbaijan
Status Residential
Context & Environment
The Absheron Conventional Gas & Condensates field is located offshore Azerbaijan Republic in the Caspian Sea in 500 meters depth, at about 100km southeast of Baku, 25km north-east of Shah Deniz field and 34km south of Oil Rocks production and processing facilities. The project aims at supplying natural gas for both domestic market via Sangachal main facilities (condensate) and for international export market via the South Caucasus Pipeline (SCP).
Missions / Service Dimensions
The service is starting from the Absheron Full Field Development (FFD) FEED phase sanction with possibilities to move to EPC phase. The service holder shall support the execution of the Absheron FFD FEED with regards to flow assurance studies including optimization in the design. The service holder will perform this work in accordance with COMPANY and Project rules, guidelines and procedures
Main Activities
The service holder must possess strong experience in pipeline flow assurance and hydraulic calculations. She or He must has been working as a pipeline simulation engineer. Knowledge of project engineering practices, international codes, standards, procedures, and specifications is a must.
The Service holder shall:
Qualifications & Experience Required
In recent years, we have invested in the digitalization of our recruitment process so that our recruiters can dedicate more time to qualitative discussions with the selected candidates. We have also redesigned our job board on the website to make it easier to find jobs and apply. The entire Recruitment team is committed to providing the best possible experience to our candidates.