Powered by
Publié il y a 3 années

Turbine Valve Supervisor

Contract Duration: 12 Months

Responsibilities

End client requirements

Overview of Requirements:

  1. Execute the Scope of Work for Turbine Generator and Main Turbine Valves during Outage U1RF02
  2. Complete Maintenance Services for TG Components, including but not limited to Pre-Planning and Project Management - 1 month before the Outage Starts Mobilization Tasks - 2 weeks before Outage starts

GENERATOR Activities - 10 days from Clearance is hung and Work Permit is Released.

  • VPLT Stator Bars Dry and Test (Vacuum/Pressure test) - 8 days from the clearance is hung and
  • Work Permit is released.
  • VALVE Maintenance (2 MSs and 2 CVs) - 10 days from the clearance is hung and Work Permit is released.
  • Demobilization - 1 week after Valve work is completed

Project Management Closure - 1 week after the last activity is completed.

Profile

  • Turbine-valve technical knowledge
  • Power plant experience
  • Fluent English
Retour aux offres

Ces offres peuvent vous intéresser

Maintenance & Inspection
Publié il y a 1 jour

FPSO Lead HVAC Engineer

France
Pétrole & Gaz
Réf : 10581
We are looking for a FPSO Lead HVAC Engineer to join our consultant team for an Oil and Gas project in France.
Maintenance & Inspection
Publié il y a 29 jours

Senior Inspection Method Engineer

Italie
Pétrole & Gaz
Réf : 10526
We are looking for a Senior Inspection Method Engineer to join our consultant team for an Oil and Gas project in Italy.

Contract Duration: 12 Months

Responsibilities

End client requirements

Overview of Requirements:

  1. Execute the Scope of Work for Turbine Generator and Main Turbine Valves during Outage U1RF02
  2. Complete Maintenance Services for TG Components, including but not limited to Pre-Planning and Project Management - 1 month before the Outage Starts Mobilization Tasks - 2 weeks before Outage starts

GENERATOR Activities - 10 days from Clearance is hung and Work Permit is Released.

  • VPLT Stator Bars Dry and Test (Vacuum/Pressure test) - 8 days from the clearance is hung and
  • Work Permit is released.
  • VALVE Maintenance (2 MSs and 2 CVs) - 10 days from the clearance is hung and Work Permit is released.
  • Demobilization - 1 week after Valve work is completed

Project Management Closure - 1 week after the last activity is completed.

Profile

  • Turbine-valve technical knowledge
  • Power plant experience
  • Fluent English
Retour aux offres

Ces offres peuvent vous intéresser

Maintenance & Inspection
Publié il y a 1 jour

FPSO Lead HVAC Engineer

France
Pétrole & Gaz
Réf : 10581
We are looking for a FPSO Lead HVAC Engineer to join our consultant team for an Oil and Gas project in France.
Maintenance & Inspection
Publié il y a 29 jours

Senior Inspection Method Engineer

Italie
Pétrole & Gaz
Réf : 10526
We are looking for a Senior Inspection Method Engineer to join our consultant team for an Oil and Gas project in Italy.
Eva BERTON
Eva BERTON
Responsable Recrutement

Ces dernières années, nous avons investi dans la digitalisation de notre processus de recrutement afin que nos recruteurs puissent dédier plus de temps aux échanges qualitatifs avec les candidats sélectionnés. Nous avons également repensé notre page Offres de mission sur le site web pour faciliter la recherche de missions et les candidatures. Toute l'équipe Recrutement a à cœur d’offrir la meilleure expérience possible à nos candidats.