Context & Environment
Gabon assets: Torpille / Anguille (offshore), Ile Mandji (onshore)
flared.
and send it to the gas lift and export networks.
Serious instabilities observed in the flaring and compression system induced by the gas interconnection
between the facilities are leading to PCV flaring. These instabilities are jeopardizing the operability
of the current system, but also future Zero flaring venting projects in Gabon.
These instabilities can be immediately reduced by analyzing and implementing regulations
quickly and drastically reduce flaring on these installations before the projects are implemented.
projects.
Offshore Congo asset: Nkossa (Offshore)
for LPG extraction and turbocompressor for gas reinjection.
Flaring project.
Severe flow instabilities lead to frequent compressor overcapacity, resulting in flaring of the compressor.
flaring via PCVs, jeopardizing the system's operability and the Nkossa Zero Routine Flaring project.
Nkossa flaring project.
Asset onshore Congo: Djeno Terminal (Onshore)
The gas recovered from the slug-catcher is highly unstable, jeopardizing the operability of the system and the terminal project.
Mission/Service Dimension
Analysis of process control activities within the Gabon and Congo subsidiaries
Work in close collaboration with a DCS/ICSS systems engineer attached to the process control missions.
Main Activities
Phase 1 - Analysis preparation
Priority work on flaring and gas regulation system
Phase 2 - Analysis
Focus (non-exhaustive list)
// First separation stages (liquid and gas outlets) level and pressure control
// Main flare PCVs (setpoints)
// Compressor suction pressure & temperature control (upstream compressors)
// Gas export and injection
Phase 3 - Set-up for process stability under current conditions
site instructions and procedures (with systems engineer)
On-site and control room monitoring and estimation of potential gains (flaring, production) with the
process engineers
Phase 4 - Zero Flaring Venting projects
Long-term monitoring of the subsidiary's process control
Qualifications & Experience Required
control room production facilities. Process expertise
oil / gas / LPG
Ces dernières années, nous avons investi dans la digitalisation de notre processus de recrutement afin que nos recruteurs puissent dédier plus de temps aux échanges qualitatifs avec les candidats sélectionnés. Nous avons également repensé notre page Offres de mission sur le site web pour faciliter la recherche de missions et les candidatures. Toute l'équipe Recrutement a à cœur d’offrir la meilleure expérience possible à nos candidats.