Duration/Location
• Starting date: Q3 2024
• Duration: 12 months minimum
• Renewable: Yes
• Location: Abidjan, Ivory Coast, Main Office Onshore site or any other premise under COMPANY control
• Status: Residential (5d/8h & Rotational 28d/12h)
Context & Environment
In 2021, the COMPANY discovered an extensive oil and associated gas field 70 km off the coast of Abidjan, Ivory Coast at a depth of 1,200 metres. It was the first commercial discovery in the country in the past 20 years. We call it fast track and it consists in running the design, authorisation and execution phases in parallel. Another innovative aspect of the project is the reuse of an existing FPSO, modernised and made technologically more advanced to ensure an accelerated start-up, optimising costs and time and minimising the waste of raw materials and construction materials.
Missions/Service Dimensions
The service holder will develop optimized well design according to Company standards & minimum requirements, integrating the most suitable technologies and well construction methods. To prepare drilling programs and related operation's plan, support its execution providing engineering advise to the SPT. To update (when necessary) well design and execution plans.
Main Responsibilities
Well design cost effectiveness
Main Working Interfaces
Services Companies
Main Activities
Assisting in the preparation and evaluation of tenders
Qualifications & Experience Required
Languages: English intermediate level (minimum)
Other Observations