Location : Courbevoie or Nantes.
1- Pre-assembly Transportation and Infrastructure (T&I) Activities
Tasks:
- Evaluation Method statements T&I Contractor
- Evaluation delivery and assembly WTG Components
- Documents for Installation Vessel / Port operation
- Liaison with Contractors including correspondence
- Liaison with wider LEMS project
Respective Timelines:
- Site 1 During 2025 / Site 2 During 2026
- Site 1 From Q4 2024 / Site 2 From Q4 2025
- Site 1 From Q2 2023 / Site 2 From Q2 2023
- Site 1 From Q2 2023 / Site 2 From Q2 2023
- Site 1 From Q2 2023 / Site 2 From Q2 2023
Respective Outputs/Deliverables:
- Comment sheets, advices / reports / ACONEX
- Follow up component delivery / Support to package manager
- Comment sheets / reports / ACONEX
- Point of contact of Installation topics. Decision / next step proposals to Package manager.
- Alignment with Contract Manager, HSE, Quality, DCC, planning, budgeting and reporting expectations.
2- Site 1 Transportation and Infrastructure (T&I) Seabed Preparation
Tasks:
- Evaluation Method statements T&I Contractor
- Preparation and follow up of execution
- Liaison with wider LEMS project
- Liaison with Marine Warranty Surveyor
- Documents for CSD vessel / Port operation
- Liaison with Contractors including correspondence
Respective Timelines:
- From Q3 2023
- From Q3 2023 Until end 2024 (foreseen),Works CM 05-07 2024.
- From Q3 2023
- From Q3 2023
- From Q2 2023
- From Q2 2023
Respective Outputs/Deliverables:
- Comment sheets, advices / reports / ACONEX
- For each contractor DPR, inspection, as-found, as left reporting processes in place.
- Alignment with Contract Manager, Permitting team HSE (SIM-OPS), Quality, DCC, planning, budgeting and reporting expectations.
- Obtain COA from MWS.
- Comment sheets / reports / ACONEX
- Point of contact of Sea bed prep topics. Decision / next step proposals to Package manager.
2- Site 1 & 2 Transportation and Infrastructure (T&I) Installation & Commissioning
Tasks:
- Evaluation Method statements T&I Contractor
- Liaise with marine Warranty Surveyor.
- Documents for Installation Vessel / Port operation, Commissioning up to Take Over.
- Support Contracting with Marshalling Harbour
- Liaison with Contractors including correspondence
- Liaison with wider LEMS project
- Follow up of Installation Interfaces, Mob and Demob
- Follow up on Installation, Commissioning and Take Over.
- Manage Client Reps on board of Installation Vessel and Commissioning Vessel
- Provision of Lessons Learnt
Respective Timelines:
- Site 1 During 2025 / Site 2 During 2026
- Site 1 From Q2 2024 / Site 2 From Q2 2025
- Site 1 From Q1 2025 / Site 2 From Q1 2026
- Site 1 From Q2 2023 Until mid-2024
- Site 1 From Q2 2023 / Site 2 From Q2 2023
- Site 1 From Q2 2023 / Site 2 From Q2 2023
- Site 1 From Q2 2023 / Site 2 From Q2 2023
- Site 1 From Q2 2025 Until Q1 2026 / Site 2 From Q2 2026 Until Q1 2027
- Site 1 From Q2 2025 / Site 2 From Q2 2026
- From Q2 2023 until Take Over.
Respective Outputs/Deliverables:
- Comment sheets, advice / reports / ACONEX
- COA’s for WTG Load out and Offshore WTG Installation
- Comment sheets / reports / As-builts / ACONEX
- Support/Align contract with port with Installation Vessel Ops. E.g. port locks (NOY).
- Point of contact of Installation topics. Decision / next step proposals to Package manager.
- Alignment with Contract Manager, HSE, Quality, DCC, planning, budgeting and reporting expectations.
- Installation interfaces installed fit for purpose.
- Installation, Commissioning and Take Over requirements delivered according to contract.
- Assist in Rep selection, scrutinize DPR’s, assess EOT and WDT
- Lessons Learnt reports.
3- Site 1 & 2 Transportation and Infrastructure (T&I) Contract Management Support
Tasks:
- Support WTG Contract Manager with Communications
- Support Contract Manager with Claims
Respective Timelines:
- Site 1 From Q2 2023 / Site 2 From Q2 2023
- Site 1 From Q2 2023 / Site 2 From Q2 2023
Respective Outputs/Deliverables:
- Drafting of required Installation Comms.
- Provide support to claim management.